Delhi Urban Environment and Infrastructure Improvement Project (DUEIIP).Government of India, Ministry of Environment and Forests and Government of National Capital Territory of Delhi, Planning Department, 2001 - City planning |
From inside the book
Results 1-3 of 8
Page 6
The first phase includes the initial stages of institutional capacity building and
technical studies or surveys required for the preparation of detail design and
bidding documents to be prepared in the second phase . The total period of the ...
The first phase includes the initial stages of institutional capacity building and
technical studies or surveys required for the preparation of detail design and
bidding documents to be prepared in the second phase . The total period of the ...
Page 10
Slum Upgrading Topographic / Infrastructure Surveys ; NGO discussions , 2 XC
Social Scientist Topographical Surveys of the alignment routes of ' offsite '
infrastructure will also be required X X X X XIX NGO's 6 and LC's 6. Topographic
and ...
Slum Upgrading Topographic / Infrastructure Surveys ; NGO discussions , 2 XC
Social Scientist Topographical Surveys of the alignment routes of ' offsite '
infrastructure will also be required X X X X XIX NGO's 6 and LC's 6. Topographic
and ...
Page 45
Graphical records ( cadastral surveys or maps produced from aerial photographs
) : The cadastral / aerial survey maps essentially comprise the graphical sketch of
each land holding with full dimensional and other relevant data and a map of ...
Graphical records ( cadastral surveys or maps produced from aerial photographs
) : The cadastral / aerial survey maps essentially comprise the graphical sketch of
each land holding with full dimensional and other relevant data and a map of ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
action activities administration agencies Annex approach appropriate areas assessment authorities bidding documents Capacity Building carried Charter collection components concerned consultants coordination cost Delhi 21 departments detailed DPCC effective Environment environmental Environmental Health existing functions future GNCTD hazardous identified implementation Improvement industrial Information System infrastructure Initiating institutional Integrated involved issues laboratory land records maps monitoring months municipal municipal bodies objectives operation Outline Technical Assistance participation phase planning planning and management PMCU pollution possible prepare present priority private sector problems procedures programmes projects proposed recommended regulatory relevant Report resource responsibilities risks role Scope setting skills Slum staff Strategic strengthen surveys tasks Technical Assistance Annex term traffic transport units Upgrading urban various waste management water cess