... area there is a two lane 8m wide metaled road for 1.5km upto the village of
Sanjay Nagar reducing to 6m wide metaled road to within 200m of the selected
site . Part II - Scientific Development of a Landfill Site at February 2001 page 3
DELHI ...
... area there is a two lane 8m wide metaled road for 1.5km upto the village of
Sanjay Nagar reducing to 6m wide metaled road to within 200m of the selected
site . Part II - Scientific Development of a Landfill Site at February 2001 page 3
DELHI ...
Page 9
4.3.2 Construction of the Access Ramp A 10 m wide ramp at a gradient of not
steeper than 1 : 15 is to be constructed along the side of the pit by excavating and
bulldozing the existing loose rock surface . The surface so achieved can be rolled
...
4.3.2 Construction of the Access Ramp A 10 m wide ramp at a gradient of not
steeper than 1 : 15 is to be constructed along the side of the pit by excavating and
bulldozing the existing loose rock surface . The surface so achieved can be rolled
...
Page
... waste would not cause any problem Noise levels in the area specially on the
main approach road will increase due to additional traffic . Dense green belt
development ( minimum 20m wide ) to be provided around the site . Traffic in the
area ...
... waste would not cause any problem Noise levels in the area specially on the
main approach road will increase due to additional traffic . Dense green belt
development ( minimum 20m wide ) to be provided around the site . Traffic in the
area ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
additional airport alternative approach base Benefits Bhati Mines body bottom capacity carried cell Central Chattarpur Compost Plant construction continuous cost cover material Deep Delhi DELHI URBAN ENVIRONMENT Design drain Electricity environmental excavated existing Figure further Government ground water growth habitats Hectare Hence human identified impact Improvement included increase indicated Infrastructure investment land fill Landfill Site landfill sites Layer leachate limits located material Million Tonnes Mitigation Measures monitoring Months municipal waste NEERI noise operation option organic period PHASE pollution Preparation present Production Project proposed reclamation recovery reduce Report result road sand sanitary landfill Scientific Development Screening serve side Site at Bhati soil solid waste Source Stores Study suitable surface surrounding Table transportation treatment trees vehicle vicinity village volume waste disposal weigh bridge wide windrow workers Zone