Delhi Urban Environment and Infrastructure Improvement Project (DUEIIP).Government of India, Ministry of Environment and Forests and Government of National Capital Territory of Delhi, Planning Department, 2001 - City planning |
From inside the book
Results 1-3 of 7
Page 11
4.3.6 Treatment of Leachate International studies have demonstrated a
substantial reduction in COD ( Chemical Oxygen Demand ) during the re -
circulation of leachate . It is , therefore , proposed that the leachate be re -
circulated at least four ...
4.3.6 Treatment of Leachate International studies have demonstrated a
substantial reduction in COD ( Chemical Oxygen Demand ) during the re -
circulation of leachate . It is , therefore , proposed that the leachate be re -
circulated at least four ...
Page 15
4.4.5 Maturation Yard The compost produced after 21 days treatment by turning
and aerating can not be readily used . It has to be stored for a minimum period of
three months before it can be used . An area of about 50,000 sqm is needed for ...
4.4.5 Maturation Yard The compost produced after 21 days treatment by turning
and aerating can not be readily used . It has to be stored for a minimum period of
three months before it can be used . An area of about 50,000 sqm is needed for ...
Page 20
The generation of landfill gas will be reduced due to the proposed removal of
organic wastes through pre - treatment by composting both at the community and
disposal level with emissions controlled by the installation of a landfill gas
recovery ...
The generation of landfill gas will be reduced due to the proposed removal of
organic wastes through pre - treatment by composting both at the community and
disposal level with emissions controlled by the installation of a landfill gas
recovery ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
additional airport alternative approach base Benefits Bhati Mines body bottom capacity carried cell Central Chattarpur Compost Plant construction continuous cost cover material Deep Delhi DELHI URBAN ENVIRONMENT Design drain Electricity environmental excavated existing Figure further Government ground water growth habitats Hectare Hence human identified impact Improvement included increase indicated Infrastructure investment land fill Landfill Site landfill sites Layer leachate limits located material Million Tonnes Mitigation Measures monitoring Months municipal waste NEERI noise operation option organic period PHASE pollution Preparation present Production Project proposed reclamation recovery reduce Report result road sand sanitary landfill Scientific Development Screening serve side Site at Bhati soil solid waste Source Stores Study suitable surface surrounding Table transportation treatment trees vehicle vicinity village volume waste disposal weigh bridge wide windrow workers Zone