The surface so achieved can be rolled with a 10 - ton roller , which shall be
sufficiently hard for safe movement of the vehicles . No other treatment needs to
be given for surfacing the pit access road . In pit No.12 , some of the material ...
The surface so achieved can be rolled with a 10 - ton roller , which shall be
sufficiently hard for safe movement of the vehicles . No other treatment needs to
be given for surfacing the pit access road . In pit No.12 , some of the material ...
Page 11
4.3.4 Control of Surface Water and Collection of Leachate A drain with a
trapezoidal section ( 1m at bottom and 1 : 2 side slopes , height 0.5m with
suitable gradient ) will need to be constructed all along the periphery of the pit at
ground level to ...
4.3.4 Control of Surface Water and Collection of Leachate A drain with a
trapezoidal section ( 1m at bottom and 1 : 2 side slopes , height 0.5m with
suitable gradient ) will need to be constructed all along the periphery of the pit at
ground level to ...
Page
Surface Water 0 0 ( Long Term Impacts ) The site has sparse vegetation and
there are no endangered species . There will be on the contrary better growth
after filling up of pits . Hence positive impact . The site is not habitat to any
endangered ...
Surface Water 0 0 ( Long Term Impacts ) The site has sparse vegetation and
there are no endangered species . There will be on the contrary better growth
after filling up of pits . Hence positive impact . The site is not habitat to any
endangered ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
additional airport alternative approach base Benefits Bhati Mines body bottom capacity carried cell Central Chattarpur Compost Plant construction continuous cost cover material Deep Delhi DELHI URBAN ENVIRONMENT Design drain Electricity environmental excavated existing Figure further Government ground water growth habitats Hectare Hence human identified impact Improvement included increase indicated Infrastructure investment land fill Landfill Site landfill sites Layer leachate limits located material Million Tonnes Mitigation Measures monitoring Months municipal waste NEERI noise operation option organic period PHASE pollution Preparation present Production Project proposed reclamation recovery reduce Report result road sand sanitary landfill Scientific Development Screening serve side Site at Bhati soil solid waste Source Stores Study suitable surface surrounding Table transportation treatment trees vehicle vicinity village volume waste disposal weigh bridge wide windrow workers Zone