Delhi Urban Environment and Infrastructure Improvement Project (DUEIIP).Government of India, Ministry of Environment and Forests and Government of National Capital Territory of Delhi, Planning Department, 2001 - City planning |
From inside the book
Results 1-3 of 6
Page 4
There is no natural water available that is needed to sustain wildlife except in the
rainy season in the form of accumulated water in the pits , which soon dries up
due to the high permeability of soil strata in the pits . 2.3 Surroundings Asola wild
...
There is no natural water available that is needed to sustain wildlife except in the
rainy season in the form of accumulated water in the pits , which soon dries up
due to the high permeability of soil strata in the pits . 2.3 Surroundings Asola wild
...
Page
1 2 3 4 5 Name of Site Area , Depth and Life of Site Remarks Capacity Puthkhurd
54.6 Hectare 17 Months Soil is suitable for use as cover material . This site in 14
km by road from Bhalswa . It is a private agricultural land and hence the ...
1 2 3 4 5 Name of Site Area , Depth and Life of Site Remarks Capacity Puthkhurd
54.6 Hectare 17 Months Soil is suitable for use as cover material . This site in 14
km by road from Bhalswa . It is a private agricultural land and hence the ...
Page
No mitigation measures required . The dumper carrying waste should be properly
covered to minimise impact on soil . Positive impact due to use of compost in the
area . There will be withdrawl of ground water and hence natural resource use .
No mitigation measures required . The dumper carrying waste should be properly
covered to minimise impact on soil . Positive impact due to use of compost in the
area . There will be withdrawl of ground water and hence natural resource use .
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
additional airport alternative approach base Benefits Bhati Mines body bottom capacity carried cell Central Chattarpur Compost Plant construction continuous cost cover material Deep Delhi DELHI URBAN ENVIRONMENT Design drain Electricity environmental excavated existing Figure further Government ground water growth habitats Hectare Hence human identified impact Improvement included increase indicated Infrastructure investment land fill Landfill Site landfill sites Layer leachate limits located material Million Tonnes Mitigation Measures monitoring Months municipal waste NEERI noise operation option organic period PHASE pollution Preparation present Production Project proposed reclamation recovery reduce Report result road sand sanitary landfill Scientific Development Screening serve side Site at Bhati soil solid waste Source Stores Study suitable surface surrounding Table transportation treatment trees vehicle vicinity village volume waste disposal weigh bridge wide windrow workers Zone