Page 9
Layers shall be laid in a way that their top slopes at 2-5 % towards the side of the
cell where a channel 0.5m x 1m size will ... To prevent the leachate entering into
fissure of rocks on the sides , it is proposed that Guniting ( a process of sealing ...
Layers shall be laid in a way that their top slopes at 2-5 % towards the side of the
cell where a channel 0.5m x 1m size will ... To prevent the leachate entering into
fissure of rocks on the sides , it is proposed that Guniting ( a process of sealing ...
Page 11
Similarly , a trapezoidal section collection pit ( 1m at bottom and 1 : 2 side slopes
, height 1m having both end closed ) will need to be constructed along the central
embankment on both sides for collection of leachate . 4.3.5 Leachate Control ...
Similarly , a trapezoidal section collection pit ( 1m at bottom and 1 : 2 side slopes
, height 1m having both end closed ) will need to be constructed along the central
embankment on both sides for collection of leachate . 4.3.5 Leachate Control ...
Page 16
It is proposed to install a minimum of 2 tube wells out side the land fill area for
meeting the water requirement . There is all the possibility that available ground
water may not be fit for human consumption , in which case drinking water shall ...
It is proposed to install a minimum of 2 tube wells out side the land fill area for
meeting the water requirement . There is all the possibility that available ground
water may not be fit for human consumption , in which case drinking water shall ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
additional airport alternative approach base Benefits Bhati Mines body bottom capacity carried cell Central Chattarpur Compost Plant construction continuous cost cover material Deep Delhi DELHI URBAN ENVIRONMENT Design drain Electricity environmental excavated existing Figure further Government ground water growth habitats Hectare Hence human identified impact Improvement included increase indicated Infrastructure investment land fill Landfill Site landfill sites Layer leachate limits located material Million Tonnes Mitigation Measures monitoring Months municipal waste NEERI noise operation option organic period PHASE pollution Preparation present Production Project proposed reclamation recovery reduce Report result road sand sanitary landfill Scientific Development Screening serve side Site at Bhati soil solid waste Source Stores Study suitable surface surrounding Table transportation treatment trees vehicle vicinity village volume waste disposal weigh bridge wide windrow workers Zone