Delhi Urban Environment and Infrastructure Improvement Project (DUEIIP).Government of India, Ministry of Environment and Forests and Government of National Capital Territory of Delhi, Planning Department, 2001 - City planning |
From inside the book
Results 1-3 of 14
Page 3
2.0 Bhati Mines - Waste Disposal for the 21st Century 2.1 Location and Approach
The site is located at the end of the Chattarpur – Bhati road at about 10-12km
from the famous Chattarpur temple on the Aravali ranges on the southern border
of ...
2.0 Bhati Mines - Waste Disposal for the 21st Century 2.1 Location and Approach
The site is located at the end of the Chattarpur – Bhati road at about 10-12km
from the famous Chattarpur temple on the Aravali ranges on the southern border
of ...
Page 15
4.5 Infrastructure and Site Amenities 4.5.1 Access Roads The main approach to
Bhati Mines road is via a four lane road except last section within the original
mine area of about 1.5km up to the proposed disposal site . This last section
which is ...
4.5 Infrastructure and Site Amenities 4.5.1 Access Roads The main approach to
Bhati Mines road is via a four lane road except last section within the original
mine area of about 1.5km up to the proposed disposal site . This last section
which is ...
Page
This site in 14 km by road from Bhalswa . It is a private agricultural land and
hence the compensation to be 2m Deep paid will be large . 3.06 Million Tonnes
Site on Bawana to Narela 28.4 Hectare 9 Months It is a saline land . The land
belongs ...
This site in 14 km by road from Bhalswa . It is a private agricultural land and
hence the compensation to be 2m Deep paid will be large . 3.06 Million Tonnes
Site on Bawana to Narela 28.4 Hectare 9 Months It is a saline land . The land
belongs ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
additional airport alternative approach base Benefits Bhati Mines body bottom capacity carried cell Central Chattarpur Compost Plant construction continuous cost cover material Deep Delhi DELHI URBAN ENVIRONMENT Design drain Electricity environmental excavated existing Figure further Government ground water growth habitats Hectare Hence human identified impact Improvement included increase indicated Infrastructure investment land fill Landfill Site landfill sites Layer leachate limits located material Million Tonnes Mitigation Measures monitoring Months municipal waste NEERI noise operation option organic period PHASE pollution Preparation present Production Project proposed reclamation recovery reduce Report result road sand sanitary landfill Scientific Development Screening serve side Site at Bhati soil solid waste Source Stores Study suitable surface surrounding Table transportation treatment trees vehicle vicinity village volume waste disposal weigh bridge wide windrow workers Zone