Delhi Urban Environment and Infrastructure Improvement Project (DUEIIP).Government of India, Ministry of Environment and Forests and Government of National Capital Territory of Delhi, Planning Department, 2001 - City planning |
From inside the book
Results 1-3 of 5
Page 8
12 alone can meet the need of the areas mentioned above for a period of next 18
years , even allowing for an 8 % annual increase in waste quantum . In addition ,
with 1,000 M.T. of waste processed daily for composting , the life of pit 12 alone ...
12 alone can meet the need of the areas mentioned above for a period of next 18
years , even allowing for an 8 % annual increase in waste quantum . In addition ,
with 1,000 M.T. of waste processed daily for composting , the life of pit 12 alone ...
Page 15
It has to be stored for a minimum period of three months before it can be used .
An area of about 50,000 sqm is needed for the maturation yard . The local ground
conditions of the upper portion of ridge will be hard enough so that not much of ...
It has to be stored for a minimum period of three months before it can be used .
An area of about 50,000 sqm is needed for the maturation yard . The local ground
conditions of the upper portion of ridge will be hard enough so that not much of ...
Page
There will be dust emission and air emission during the site development period
due to vehicular movement and operation of construction equipment . In order to
mitigate adverse environmental impacts the contractor should spray water ...
There will be dust emission and air emission during the site development period
due to vehicular movement and operation of construction equipment . In order to
mitigate adverse environmental impacts the contractor should spray water ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
additional airport alternative approach base Benefits Bhati Mines body bottom capacity carried cell Central Chattarpur Compost Plant construction continuous cost cover material Deep Delhi DELHI URBAN ENVIRONMENT Design drain Electricity environmental excavated existing Figure further Government ground water growth habitats Hectare Hence human identified impact Improvement included increase indicated Infrastructure investment land fill Landfill Site landfill sites Layer leachate limits located material Million Tonnes Mitigation Measures monitoring Months municipal waste NEERI noise operation option organic period PHASE pollution Preparation present Production Project proposed reclamation recovery reduce Report result road sand sanitary landfill Scientific Development Screening serve side Site at Bhati soil solid waste Source Stores Study suitable surface surrounding Table transportation treatment trees vehicle vicinity village volume waste disposal weigh bridge wide windrow workers Zone