Delhi Urban Environment and Infrastructure Improvement Project (DUEIIP).Government of India, Ministry of Environment and Forests and Government of National Capital Territory of Delhi, Planning Department, 2001 - City planning |
From inside the book
Results 1-3 of 12
Page
4.3.4 Control of Surface Water and Collection of Leachate 4.3.5 Leachate Control
............ 4.3.6 Treatment of Leachate ..... 4.3.7 Landfill Gas .......... .9 .9 ..9 11 11 11
12 Part II - Scientific Development of a Landfill Site at February 2001 Contents ...
4.3.4 Control of Surface Water and Collection of Leachate 4.3.5 Leachate Control
............ 4.3.6 Treatment of Leachate ..... 4.3.7 Landfill Gas .......... .9 .9 ..9 11 11 11
12 Part II - Scientific Development of a Landfill Site at February 2001 Contents ...
Page 11
4.3.4 Control of Surface Water and Collection of Leachate A drain with a
trapezoidal section ( 1m at bottom and 1 : 2 side slopes , height 0.5m with
suitable gradient ) will need to be constructed all along the periphery of the pit at
ground level to ...
4.3.4 Control of Surface Water and Collection of Leachate A drain with a
trapezoidal section ( 1m at bottom and 1 : 2 side slopes , height 0.5m with
suitable gradient ) will need to be constructed all along the periphery of the pit at
ground level to ...
Page
Leachate not likely to be discharged in any river or Nallah . Hence no long term
impact . No long term impact on ground waster envisaged as leachate collection
and disposal has been planned in the design . However there will be marginal ...
Leachate not likely to be discharged in any river or Nallah . Hence no long term
impact . No long term impact on ground waster envisaged as leachate collection
and disposal has been planned in the design . However there will be marginal ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
additional airport alternative approach base Benefits Bhati Mines body bottom capacity carried cell Central Chattarpur Compost Plant construction continuous cost cover material Deep Delhi DELHI URBAN ENVIRONMENT Design drain Electricity environmental excavated existing Figure further Government ground water growth habitats Hectare Hence human identified impact Improvement included increase indicated Infrastructure investment land fill Landfill Site landfill sites Layer leachate limits located material Million Tonnes Mitigation Measures monitoring Months municipal waste NEERI noise operation option organic period PHASE pollution Preparation present Production Project proposed reclamation recovery reduce Report result road sand sanitary landfill Scientific Development Screening serve side Site at Bhati soil solid waste Source Stores Study suitable surface surrounding Table transportation treatment trees vehicle vicinity village volume waste disposal weigh bridge wide windrow workers Zone