However , an electric substation would be included for taking the required
electrical load from D.V.B. , which would be required for the Compost Plant and
general site lighting . 4.5.6 Lighting Arrangements High mast lights will be ...
However , an electric substation would be included for taking the required
electrical load from D.V.B. , which would be required for the Compost Plant and
general site lighting . 4.5.6 Lighting Arrangements High mast lights will be ...
Page 18
This cost is only for the initial on and off - site infrastructure required to prepare
the site for operation . The further development of the site would be included in
the operational costs . As part of the development , a compost plant costing Rs.
170 ...
This cost is only for the initial on and off - site infrastructure required to prepare
the site for operation . The further development of the site would be included in
the operational costs . As part of the development , a compost plant costing Rs.
170 ...
Page 20
It is proposed that valorization of waste using composting , ' waste to power ' , etc
is included to prolong the life of the landfill site and also provide additional return
on investment . However , any imposed form of valorization by the local body ...
It is proposed that valorization of waste using composting , ' waste to power ' , etc
is included to prolong the life of the landfill site and also provide additional return
on investment . However , any imposed form of valorization by the local body ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
additional airport alternative approach base Benefits Bhati Mines body bottom capacity carried cell Central Chattarpur Compost Plant construction continuous cost cover material Deep Delhi DELHI URBAN ENVIRONMENT Design drain Electricity environmental excavated existing Figure further Government ground water growth habitats Hectare Hence human identified impact Improvement included increase indicated Infrastructure investment land fill Landfill Site landfill sites Layer leachate limits located material Million Tonnes Mitigation Measures monitoring Months municipal waste NEERI noise operation option organic period PHASE pollution Preparation present Production Project proposed reclamation recovery reduce Report result road sand sanitary landfill Scientific Development Screening serve side Site at Bhati soil solid waste Source Stores Study suitable surface surrounding Table transportation treatment trees vehicle vicinity village volume waste disposal weigh bridge wide windrow workers Zone