Page 3
... approximately 20km from Delhi airport . The site is approached by a four lane
metalled road with low traffic intensity . This high capacity road was originally
constructed to serve the Bhati Mines for transporting excavated building sand
and ...
... approximately 20km from Delhi airport . The site is approached by a four lane
metalled road with low traffic intensity . This high capacity road was originally
constructed to serve the Bhati Mines for transporting excavated building sand
and ...
Page 6
Tonnes Cover Material In the estimates made for the life of this pit , no allowance
has been taken for the covering materials as the same will be excavated from the
pit area itself . 4.2 City Areas to be served 4.2.1 South , Central and West Zones ...
Tonnes Cover Material In the estimates made for the life of this pit , no allowance
has been taken for the covering materials as the same will be excavated from the
pit area itself . 4.2 City Areas to be served 4.2.1 South , Central and West Zones ...
Page 9
Secondly , for the daily covering of deposited waste material can be made
available locally by excavating loose material ... In pit No.12 , some of the
material excavated will also be used for making an embankment between the two
halves .
Secondly , for the daily covering of deposited waste material can be made
available locally by excavating loose material ... In pit No.12 , some of the
material excavated will also be used for making an embankment between the two
halves .
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
additional airport alternative approach base Benefits Bhati Mines body bottom capacity carried cell Central Chattarpur Compost Plant construction continuous cost cover material Deep Delhi DELHI URBAN ENVIRONMENT Design drain Electricity environmental excavated existing Figure further Government ground water growth habitats Hectare Hence human identified impact Improvement included increase indicated Infrastructure investment land fill Landfill Site landfill sites Layer leachate limits located material Million Tonnes Mitigation Measures monitoring Months municipal waste NEERI noise operation option organic period PHASE pollution Preparation present Production Project proposed reclamation recovery reduce Report result road sand sanitary landfill Scientific Development Screening serve side Site at Bhati soil solid waste Source Stores Study suitable surface surrounding Table transportation treatment trees vehicle vicinity village volume waste disposal weigh bridge wide windrow workers Zone