Page 11
4.3.4 Control of Surface Water and Collection of Leachate A drain with a
trapezoidal section ( 1m at bottom and 1 : 2 side slopes , height 0.5m with
suitable gradient ) will need to be constructed all along the periphery of the pit at
ground level to ...
4.3.4 Control of Surface Water and Collection of Leachate A drain with a
trapezoidal section ( 1m at bottom and 1 : 2 side slopes , height 0.5m with
suitable gradient ) will need to be constructed all along the periphery of the pit at
ground level to ...
Page 15
The local ground conditions of the upper portion of ridge will be hard enough so
that not much of the treatment is needed except construction of drains all round
the yard to remove run off from the stored compost . 4.5 Infrastructure and Site ...
The local ground conditions of the upper portion of ridge will be hard enough so
that not much of the treatment is needed except construction of drains all round
the yard to remove run off from the stored compost . 4.5 Infrastructure and Site ...
Page 17
... Ramp to the bottom of pit 02.00 iv Surface drainage arrangements 04.00 V Site
fencing 08.00 vi Weigh bridge 06.00 vii Provision of water & electricity 05.00 viji
Civil / Office Structures 08.00 ix Lighting arrangements 07.00 х Plantation 02.00 ...
... Ramp to the bottom of pit 02.00 iv Surface drainage arrangements 04.00 V Site
fencing 08.00 vi Weigh bridge 06.00 vii Provision of water & electricity 05.00 viji
Civil / Office Structures 08.00 ix Lighting arrangements 07.00 х Plantation 02.00 ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
additional airport alternative approach base Benefits Bhati Mines body bottom capacity carried cell Central Chattarpur Compost Plant construction continuous cost cover material Deep Delhi DELHI URBAN ENVIRONMENT Design drain Electricity environmental excavated existing Figure further Government ground water growth habitats Hectare Hence human identified impact Improvement included increase indicated Infrastructure investment land fill Landfill Site landfill sites Layer leachate limits located material Million Tonnes Mitigation Measures monitoring Months municipal waste NEERI noise operation option organic period PHASE pollution Preparation present Production Project proposed reclamation recovery reduce Report result road sand sanitary landfill Scientific Development Screening serve side Site at Bhati soil solid waste Source Stores Study suitable surface surrounding Table transportation treatment trees vehicle vicinity village volume waste disposal weigh bridge wide windrow workers Zone