Delhi Urban Environment and Infrastructure Improvement Project (DUEIIP).Government of India, Ministry of Environment and Forests and Government of National Capital Territory of Delhi, Planning Department, 2001 - City planning |
From inside the book
Results 1-3 of 3
Page
4.3.1 Stage Development ......... 4.3.2 Construction of the Access Ramp . ...... 4.3.3
Preparation of the Pit Base and Filling Operations ........ 4.3.4 Control of Surface
Water and Collection of Leachate 4.3.5 Leachate Control ............ 4.3.6 Treatment
...
4.3.1 Stage Development ......... 4.3.2 Construction of the Access Ramp . ...... 4.3.3
Preparation of the Pit Base and Filling Operations ........ 4.3.4 Control of Surface
Water and Collection of Leachate 4.3.5 Leachate Control ............ 4.3.6 Treatment
...
Page 5
3.1.3 Danger to Aircraft Landfill site shall be away from Airports and Air bases .
Necessary approval of the airport or air base authorities prior to setting up of the
landfill site shall be obtained in cases where the site is to be located within 20 km
...
3.1.3 Danger to Aircraft Landfill site shall be away from Airports and Air bases .
Necessary approval of the airport or air base authorities prior to setting up of the
landfill site shall be obtained in cases where the site is to be located within 20 km
...
Page 9
4.3.3 Preparation of the Pit Base and Filling Operations The base of the pit is
sufficiently level to proceed with development immediately only minor
undulations will require levelling . However , the base needs to be sealed to
prevent any ...
4.3.3 Preparation of the Pit Base and Filling Operations The base of the pit is
sufficiently level to proceed with development immediately only minor
undulations will require levelling . However , the base needs to be sealed to
prevent any ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
additional airport alternative approach base Benefits Bhati Mines body bottom capacity carried cell Central Chattarpur Compost Plant construction continuous cost cover material Deep Delhi DELHI URBAN ENVIRONMENT Design drain Electricity environmental excavated existing Figure further Government ground water growth habitats Hectare Hence human identified impact Improvement included increase indicated Infrastructure investment land fill Landfill Site landfill sites Layer leachate limits located material Million Tonnes Mitigation Measures monitoring Months municipal waste NEERI noise operation option organic period PHASE pollution Preparation present Production Project proposed reclamation recovery reduce Report result road sand sanitary landfill Scientific Development Screening serve side Site at Bhati soil solid waste Source Stores Study suitable surface surrounding Table transportation treatment trees vehicle vicinity village volume waste disposal weigh bridge wide windrow workers Zone