Delhi Urban Environment and Infrastructure Improvement Project (DUEIIP).Government of India, Ministry of Environment and Forests and Government of National Capital Territory of Delhi, Planning Department, 2001 - City planning |
From inside the book
Results 1-3 of 6
Page 1
The sites are almost full and the balance life has reached a critical stage , as
indicated in table 1.1 . Table 1.1 : Balance Life of Landfill Sites Name of Land Fill
Sites Balaswa G.T. Road Gazipur Okhla Balance life Almost exhausted 2 - 3
years 6 ...
The sites are almost full and the balance life has reached a critical stage , as
indicated in table 1.1 . Table 1.1 : Balance Life of Landfill Sites Name of Land Fill
Sites Balaswa G.T. Road Gazipur Okhla Balance life Almost exhausted 2 - 3
years 6 ...
Page 6
... of the fill material will be much greater than normally achieved , thus increasing
the pit life . Based on a density of 1.4 kg per cum the quantities of waste that pit
Nos . 10 and 12 can hold in their present form is shown in Table 4.1.1 Table 4.1.1
...
... of the fill material will be much greater than normally achieved , thus increasing
the pit life . Based on a density of 1.4 kg per cum the quantities of waste that pit
Nos . 10 and 12 can hold in their present form is shown in Table 4.1.1 Table 4.1.1
...
Page 7
Table 4.2.1 - Generation of wastes from the South , Central and West Zones Zone
Waste Production per day 2000 Waste Production per day 2021 1,900 M.T. South
Zone 400 M.T Central Zone 500 M.T West Zone 300 M.T 1,200 M.T 2,300 M.T. ...
Table 4.2.1 - Generation of wastes from the South , Central and West Zones Zone
Waste Production per day 2000 Waste Production per day 2021 1,900 M.T. South
Zone 400 M.T Central Zone 500 M.T West Zone 300 M.T 1,200 M.T 2,300 M.T. ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
additional airport alternative approach base Benefits Bhati Mines body bottom capacity carried cell Central Chattarpur Compost Plant construction continuous cost cover material Deep Delhi DELHI URBAN ENVIRONMENT Design drain Electricity environmental excavated existing Figure further Government ground water growth habitats Hectare Hence human identified impact Improvement included increase indicated Infrastructure investment land fill Landfill Site landfill sites Layer leachate limits located material Million Tonnes Mitigation Measures monitoring Months municipal waste NEERI noise operation option organic period PHASE pollution Preparation present Production Project proposed reclamation recovery reduce Report result road sand sanitary landfill Scientific Development Screening serve side Site at Bhati soil solid waste Source Stores Study suitable surface surrounding Table transportation treatment trees vehicle vicinity village volume waste disposal weigh bridge wide windrow workers Zone