0 0.5 1 km Source : DSIDC / DSMDC Waste Generation The present waste
generation from these areas is about 1,200 M.T per day and is expected to
increase to nearly 5,600 M.T. per day by year 2021 , as indicated in table 4.2.1 .
Table 4.2.1 ...
0 0.5 1 km Source : DSIDC / DSMDC Waste Generation The present waste
generation from these areas is about 1,200 M.T per day and is expected to
increase to nearly 5,600 M.T. per day by year 2021 , as indicated in table 4.2.1 .
Table 4.2.1 ...
Page 16
Part II - Scientific Development of a Landfill Site at Bhati Mines 4.5.5 Water
Supply Water Source This would have to be developed locally as no piped mains
water is available in the vicinity . The only option left is to use under ground water
by ...
Part II - Scientific Development of a Landfill Site at Bhati Mines 4.5.5 Water
Supply Water Source This would have to be developed locally as no piped mains
water is available in the vicinity . The only option left is to use under ground water
by ...
Page
No surface water sources are present in the vicinity of .disposal site . Leachate
not likely to be ... No impact envisaged during construction as surface run off will
not lead to any surface water source . All site drainage will be lead to the pits and
...
No surface water sources are present in the vicinity of .disposal site . Leachate
not likely to be ... No impact envisaged during construction as surface run off will
not lead to any surface water source . All site drainage will be lead to the pits and
...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
additional airport alternative approach base Benefits Bhati Mines body bottom capacity carried cell Central Chattarpur Compost Plant construction continuous cost cover material Deep Delhi DELHI URBAN ENVIRONMENT Design drain Electricity environmental excavated existing Figure further Government ground water growth habitats Hectare Hence human identified impact Improvement included increase indicated Infrastructure investment land fill Landfill Site landfill sites Layer leachate limits located material Million Tonnes Mitigation Measures monitoring Months municipal waste NEERI noise operation option organic period PHASE pollution Preparation present Production Project proposed reclamation recovery reduce Report result road sand sanitary landfill Scientific Development Screening serve side Site at Bhati soil solid waste Source Stores Study suitable surface surrounding Table transportation treatment trees vehicle vicinity village volume waste disposal weigh bridge wide windrow workers Zone