Table 1.1 : Balance Life of Landfill Sites Name of Land Fill Sites Balaswa G.T.
Road Gazipur Okhla Balance life Almost exhausted 2 - 3 years 6 months Part II -
Scientific Development of a Landfill Site at February 2001 page 1 DELHI URBAN
...
Table 1.1 : Balance Life of Landfill Sites Name of Land Fill Sites Balaswa G.T.
Road Gazipur Okhla Balance life Almost exhausted 2 - 3 years 6 months Part II -
Scientific Development of a Landfill Site at February 2001 page 1 DELHI URBAN
...
Page 15
It has to be stored for a minimum period of three months before it can be used .
An area of about 50,000 sqm is needed for the maturation yard . The local ground
conditions of the upper portion of ridge will be hard enough so that not much of ...
It has to be stored for a minimum period of three months before it can be used .
An area of about 50,000 sqm is needed for the maturation yard . The local ground
conditions of the upper portion of ridge will be hard enough so that not much of ...
Page
1 2 3 4 5 Name of Site Area , Depth and Life of Site Remarks Capacity Puthkhurd
54.6 Hectare 17 Months Soil is suitable for use as cover material . This site in 14
km by road from Bhalswa . It is a private agricultural land and hence the ...
1 2 3 4 5 Name of Site Area , Depth and Life of Site Remarks Capacity Puthkhurd
54.6 Hectare 17 Months Soil is suitable for use as cover material . This site in 14
km by road from Bhalswa . It is a private agricultural land and hence the ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
additional airport alternative approach base Benefits Bhati Mines body bottom capacity carried cell Central Chattarpur Compost Plant construction continuous cost cover material Deep Delhi DELHI URBAN ENVIRONMENT Design drain Electricity environmental excavated existing Figure further Government ground water growth habitats Hectare Hence human identified impact Improvement included increase indicated Infrastructure investment land fill Landfill Site landfill sites Layer leachate limits located material Million Tonnes Mitigation Measures monitoring Months municipal waste NEERI noise operation option organic period PHASE pollution Preparation present Production Project proposed reclamation recovery reduce Report result road sand sanitary landfill Scientific Development Screening serve side Site at Bhati soil solid waste Source Stores Study suitable surface surrounding Table transportation treatment trees vehicle vicinity village volume waste disposal weigh bridge wide windrow workers Zone